Standard work

Also called standardized work

Standard work describes the current agreed way to perform a task safely and well. In manufacturing it has three elements: takt time, the work sequence and standard in-process stock. It is written by and with the people who do the work.

Lean teams use standard work as the baseline for improvement. Without a standard, you cannot tell whether a change helped or whether a problem is new. It also makes training faster and results more consistent across shifts.

Where it comes from

Standardized work is a foundation of the Toyota Production System, built on takt time, work sequence and standard in-process stock. Its training methods also draw on Training Within Industry job instruction.

At a glance

The three elements and a combination chart

The three elements and a combination chart. A standard work combination chart shows manual, machine and walking time for each step against takt.Takt timethe paceWork sequencethe best known orderStandard WIPthe minimum stock0s10s20s30s40s50s1. Load part2. Start cycle3. Walk to bench4. Deburr last part5. Inspect and packTaktManualMachineWalk

Swipe sideways to see the whole diagram.

A standard work combination chart shows manual, machine and walking time for each step against takt.

How to apply Standard Work

  1. 1

    Observe the current method

    Watch several operators perform the task over multiple cycles. Note the steps, variation between people and any waiting or rework.

  2. 2

    Break the task into elements

    List each work element in order and time it. Identify key points that affect safety, quality or ease of work.

  3. 3

    Agree on the current method

    With the operators, choose the method that is safest and most consistent. Remove obvious waste before you write it down.

  4. 4

    Document it visually

    Create a standard work sheet or instruction with photos, sequence, timing and key points. Keep it short and post it at the point of use.

  5. 5

    Train to the standard

    Teach the method step by step and confirm each person can perform it. Track who is qualified on which tasks.

  6. 6

    Audit and improve

    Check regularly that work follows the standard. When someone finds a better way, test it and update the standard so the gain sticks.

Worked example

A machine shop finds that changeover results vary by shift. Operators from each shift agree on one sequence and record it with photos and key points. Changeovers become more consistent, and the next kaizen starts from that shared baseline.

Common mistakes

  • Having engineers write standards alone, so operators do not trust or follow them.
  • Treating the standard as permanent instead of the starting point for improvement.
  • Writing long text documents that nobody reads at the workstation.

When Standard Work is not the right tool

Rigid step-by-step standards fit repetitive work. Highly varied knowledge work needs lighter standards, such as checklists, definitions of done and agreed policies.

A standard written without the people who do the work rarely holds.

Standard work procedures

A standard work procedure documents the current best way to do a task: the sequence of steps, the time each takes and the amount of work in progress needed. It is written with the people who do the work, not for them.

Unlike a long SOP, standard work is short and visual. Photos, key points and the reason for each key point fit on one page posted at the workstation. When someone finds a better way, the procedure is updated, so the standard is the base for kaizen.

The three standard work forms

Manufacturing teams often use three forms. A process capacity sheet shows what each machine can produce. A combination table shows manual, machine and walking time against takt.

A standard work chart shows the layout, the operator's path and where stock is held.

Training to the standard

Training Within Industry job instruction teaches a standard in four steps: prepare the learner, present the job, try out performance and follow up.

Leaders keep their own routine too. Gemba walks are part of leader standard work.

FAQ

Standard Work: common questions

Is standard work a lean tool?
Yes. Standard work is one of the core lean tools. It provides the stable baseline that continuous improvement builds on.
Is standard work the same as a work instruction?
Not exactly. A work instruction describes how to do a task. Standard work also ties the task to takt time, sequence and in-process stock.
Does standard work kill creativity?
It should not. The standard captures the current agreed method, and people are expected to suggest better ones. Improvements are then built into the next version.
What is a standard work procedure?
A short, visual document of the current best sequence, timing and work in progress for a task, posted where the work is done.
What is a standard work combination table?
A form that shows each step's manual, machine and walking time on a timeline against takt time. It shows whether one operator can complete the cycle in time.
What is leader standard work?
A defined routine for supervisors and managers, such as gemba walks, reviews of team boards and following up on problems.

For vendors

Built a lean tool?

Submit it for review. Every tool is checked against our listing criteria and researched from public sources. Approved tools join their category in the next published batch.