Five whys root cause analysis

The 5 Whys is a simple root cause technique. You state a problem, ask why it happened, then ask why again of each answer until you reach a fixable cause.

Lean teams use it because it is quick and needs little training or software. It pushes teams to fix the process instead of blaming people or patching symptoms.

Where it comes from

The technique is credited to Sakichi Toyoda and was promoted by Taiichi Ohno within the Toyota Production System.

At a glance

Asking why until the cause is fixable

Asking why until the cause is fixable. The worked example from this page: five whys lead from a stopped machine to a missing strainer.Machine stoppedWhy?The fuse blewWhy?The motor overloadedWhy?The bearing lacked oilWhy?The lube pump cloggedWhy?No strainer on the intakeRoot causeCOUNTERMEASUREFit a strainer and addit to the PM checklist

Swipe sideways to see the whole diagram.

The worked example from this page: five whys lead from a stopped machine to a missing strainer.

How to apply 5 Whys

  1. 1

    Define the problem precisely

    Write a specific, factual problem statement. Include what happened, where and when.

  2. 2

    Gather the right people

    Include people who do the work and saw the problem. Go to the gemba if you can.

  3. 3

    Ask why and record the answer

    Answer with facts you can verify. Each answer becomes the subject of the next why.

  4. 4

    Keep going until it is actionable

    Five is a guide, not a rule. Stop when you reach a process cause you can control and fix.

  5. 5

    Verify the chain

    Read the chain backward using "therefore" to check the logic. If a link fails, revisit it.

  6. 6

    Act and follow up

    Put a countermeasure on the root cause and confirm the problem does not return.

Worked example

A machine stopped because a fuse blew. The fuse blew because the motor overloaded, which happened because a bearing lacked lubrication. The lube pump intake had no strainer and clogged, so the fix is adding a strainer and a check to the PM schedule.

Common mistakes

  • Stopping at human error, such as "the operator forgot", instead of asking why the process allowed it.
  • Following a single chain when the problem has several contributing causes.
  • Accepting guesses as answers without checking them against data or the gemba.

When 5 Whys is not the right tool

Five whys follows one chain of cause. Problems with several interacting causes need a fishbone diagram or a fuller investigation.

The answers also depend on who is in the room. Check each answer with data or at the gemba before you act on it.

Branching whys

When an answer has more than one cause, split the chain. Each branch gets its own series of whys, which turns the list into a small tree.

Stop when you reach a cause you can act on that would prevent the problem returning. The number five is a guide, not a rule.

FAQ

5 Whys: common questions

Is the 5 Whys a lean tool?
Yes. The 5 Whys is a basic lean problem-solving tool from Toyota. It is often used inside A3 reports and kaizen events.
Do you always have to ask why exactly five times?
No. Five is a rule of thumb. Some problems resolve in three whys and others need more.
When should you use a fishbone diagram instead?
Use a fishbone when a problem likely has many possible causes. It helps you brainstorm broadly, and 5 Whys then drills into the most likely ones.
What are the limits of five whys?
It can stop at a symptom, follow only one cause, or reflect what people assume rather than what happened. Testing each answer with facts reduces these risks.
Is five whys a Six Sigma tool?
It comes from the Toyota Production System, but Lean Six Sigma projects use it widely, often in the Analyze phase of DMAIC.