Muda, often remembered as DOWNTIME

The eight wastes are categories of activity that consume time or resources without adding value for the customer. They are defects, overproduction, waiting, non-utilized talent, transportation, inventory, motion and extra processing. The acronym DOWNTIME helps people remember them.

Lean teams use the eight wastes as a lens for seeing problems. Naming waste makes it easier to spot during gemba walks and value stream mapping. Removing waste shortens lead time and frees people for value-adding work.

Where it comes from

Taiichi Ohno described seven wastes as part of the Toyota Production System. Many practitioners later added non-utilized talent, giving the eight wastes used today.

At a glance

The 8 wastes (DOWNTIME)

The 8 wastes (DOWNTIME). Each waste with an everyday example from the print shop in the worked example.DDefectsReprints fromunclear specsOOverproductionExtra copies madejust in caseWWaitingJobs held forapprovalNNon-utilizedtalentSkills left unusedTTransportationMoving jobsbetween roomsIInventoryStacks of finishedjobsMMotionWalking to adistant cutterEExtra processingProofs nobodyreads

Swipe sideways to see the whole diagram.

Each waste with an everyday example from the print shop in the worked example.

How to apply The 8 Wastes of Lean

  1. 1

    Learn the eight categories

    Teach the team each waste with examples from your own process. Local examples are easier to remember than generic ones.

  2. 2

    Choose a process to study

    Pick one value stream or area with a clear start and end. Keep the scope small enough to observe in one session.

  3. 3

    Go and observe

    Walk the process and note each waste you see, tagged by category. Follow the product, the information and the people.

  4. 4

    Quantify the biggest wastes

    Estimate time, distance, inventory or defects for the most visible items. Rough measurement is enough to prioritize.

  5. 5

    Find root causes

    Ask why each waste exists. Overproduction, for example, often comes from large batches or unreliable equipment.

  6. 6

    Remove waste and standardize

    Run small experiments to eliminate the top items. Update standard work so the waste does not creep back.

Worked example (illustrative)

A print shop team walks an order from intake to shipping and logs 20 wastes. Waiting is the most common, with 6 entries, mostly jobs held for approval. Motion comes next with 4, from walking to a distant cutter, and defects third with 3 reprints from unclear specs. Moving the cutter and adding an approval checklist removes the top three. On the next walk a month later, the team logs 9 wastes.

Common mistakes

  • Listing wastes without measuring or fixing any of them.
  • Mistaking necessary non-value-added work, like legal checks, for pure waste to delete.
  • Using waste hunts to cut headcount, which makes people stop pointing out waste.

When The 8 Wastes of Lean is not the right tool

Spotting waste is only a starting point. Naming a waste does not remove it; that takes a method such as PDCA.

Some activity that adds no value is still required, such as legal checks. Reduce it where you can, but do not remove it.

The 7 wastes

Taiichi Ohno described seven wastes (muda) at Toyota: transport, inventory, motion, waiting, overproduction, over-processing and defects. Each uses time or resources without adding value the customer would pay for.

Ohno's own terms were slightly different: overproduction, waiting, conveyance, processing, inventory, motion and correction. Conveyance is transport, processing is over-processing and correction is defects.

Later writers added an eighth waste, unused talent or skills: not using people's knowledge and ideas. Jeffrey Liker's The Toyota Way discusses it as unused employee creativity. That gives the 8 wastes most lean training uses today.

TIMWOODS

TIMWOODS is one memory aid for the 8 wastes: Transport, Inventory, Motion, Waiting, Overproduction, Over-processing, Defects and Skills.

DOWNTIME

DOWNTIME is another memory aid for the same list: Defects, Overproduction, Waiting, Non-utilized talent, Transportation, Inventory, Motion and Extra-processing. Teams pick whichever is easier to remember; the wastes are the same.

How to run a waste walk

A waste walk is a planned walk along the value stream to find these wastes before anyone picks a fix. Follow one product or order from start to finish, and ask the people doing the work what slows them down. Seven questions cover most of it:

Waste walk

  • Where does work wait? Queues before machines, inspections, approvals or forklifts.
  • Where does work move? Trace parts, people, tools, paperwork and data.
  • Where is work redone? Repairs, corrections, retests and repeated data entry.
  • Where does stock pile up? Ask what uncertainty each pile protects against.
  • Where do people search? Hunting for tools, parts, files or decisions points to a missing standard.
  • Where do methods differ? Two people doing the same job two ways often means missing training or an outdated instruction.
  • Where do people work around the process? Workarounds show the gap between the official method and the real one.

Opinion

Shipping is disorganized.

Observation

Operators searched three locations for the right cartons before packing.

Write down what you see, not what you think of it. A specific observation points to a fix, while an opinion starts an argument. Then rank what you found by safety, quality, customer impact and how often it happens, and pick one problem to work on.

The eight wastes outside the factory

The same eight wastes show up in offices, software, healthcare and logistics. Each has a usual first move:

Defects

Errors, returns, bad data, failed checks

Where to start: Build quality into the step and fix the root cause

Overproduction

Making too much or too early, reports nobody reads

Where to start: Work to demand and cut batch sizes

Waiting

Idle people, stalled approvals, late materials

Where to start: Remove the bottleneck and set clear triggers

Non-utilized talent

Ideas ignored, skills unused

Where to start: Involve people in solving problems

Transportation

Moving products or files with no need

Where to start: Redesign the layout or the flow of information

Inventory

Excess stock, backlogs, unfinished work

Where to start: Match work in progress to demand

Motion

Searching, walking, clicking, switching systems

Where to start: Organize tools, workspace and digital files

Extra processing

Duplicate checks, extra reports, repeated data entry

Where to start: Simplify rules and remove duplication

Removing waste does not mean asking people to work faster. Ask what gets in the way of valuable work, and change the design.

Muda, mura and muri
TermMeaningExample
MudaWaste: activity that adds no valueParts waiting between steps
MuraUnevenness in the flow of workOrders bunched at month end
MuriOverburden of people or equipmentA machine run beyond its rated speed

Guides on this topic

Sources

Books and papers show their publication year. Web pages show the month we last checked them.

  1. 1.Taiichi Ohno, Toyota Production System: Beyond Large-Scale Production (Productivity Press, 1988)
  2. 2.Jeffrey K. Liker, The Toyota Way: 14 Management Principles from the World's Greatest Manufacturer (McGraw-Hill, 2004)

FAQ

The 8 Wastes of Lean: common questions

Are the 8 wastes a lean tool?
The 8 wastes are a lean concept rather than a single tool. They give teams a shared language for spotting waste before applying tools like value stream mapping or 5S.
What are the 8 wastes of lean?
Defects, overproduction, waiting, non-utilized talent, transportation, inventory, motion and extra processing. Together they spell DOWNTIME.
Which waste is the worst?
Taiichi Ohno singled out overproduction, because it creates other wastes like inventory, transport and hidden defects.
What are the 7 wastes of lean?
Transport, inventory, motion, waiting, overproduction, over-processing and defects.
What does TIMWOODS stand for?
Transport, Inventory, Motion, Waiting, Overproduction, Over-processing, Defects and Skills.
What does DOWNTIME stand for?
Defects, Overproduction, Waiting, Non-utilized talent, Transportation, Inventory, Motion and Extra-processing.
What is the difference between muda, mura and muri?
Muda is waste, mura is unevenness and muri is overburden. Uneven work and overburden often create the waste.
What is the difference between the 7 and 8 wastes?
The original seven come from Taiichi Ohno. The eighth, unused talent, was added later by lean practitioners.