The 8 wastes of lean

Muda, often remembered as DOWNTIME

The eight wastes are categories of activity that consume time or resources without adding value for the customer. They are defects, overproduction, waiting, non-utilized talent, transportation, inventory, motion and extra processing. The acronym DOWNTIME helps people remember them.

Lean teams use the eight wastes as a lens for seeing problems. Naming waste makes it easier to spot during gemba walks and value stream mapping. Removing waste shortens lead time and frees people for value-adding work.

Where it comes from

Taiichi Ohno described seven wastes as part of the Toyota Production System. Many practitioners later added non-utilized talent, giving the eight wastes used today.

At a glance

The 8 wastes (DOWNTIME)

The 8 wastes (DOWNTIME). Each waste with an everyday example from the print shop in the worked example.DDefectsReprints fromunclear specsOOverproductionExtra copies madejust in caseWWaitingJobs held forapprovalNNon-utilizedtalentSkills left unusedTTransportationMoving jobsbetween roomsIInventoryStacks of finishedjobsMMotionWalking to adistant cutterEExtra processingProofs nobodyreads

Swipe sideways to see the whole diagram.

Each waste with an everyday example from the print shop in the worked example.

How to apply The 8 Wastes of Lean

  1. 1

    Learn the eight categories

    Teach the team each waste with examples from your own process. Local examples are easier to remember than generic ones.

  2. 2

    Choose a process to study

    Pick one value stream or area with a clear start and end. Keep the scope small enough to observe in one session.

  3. 3

    Go and observe

    Walk the process and note each waste you see, tagged by category. Follow the product, the information and the people.

  4. 4

    Quantify the biggest wastes

    Estimate time, distance, inventory or defects for the most visible items. Rough measurement is enough to prioritize.

  5. 5

    Find root causes

    Ask why each waste exists. Overproduction, for example, often comes from large batches or unreliable equipment.

  6. 6

    Remove waste and standardize

    Run small experiments to eliminate the top items. Update standard work so the waste does not creep back.

Worked example

A print shop team walks an order from intake to shipping. They log reprints from unclear specs, jobs waiting for approval and operators walking to a distant cutter. Moving the cutter and adding an approval checklist removes three of the most visible wastes.

Common mistakes

  • Listing wastes without measuring or fixing any of them.
  • Mistaking necessary non-value-added work, like legal checks, for pure waste to delete.
  • Using waste hunts to cut headcount, which makes people stop pointing out waste.

When The 8 Wastes of Lean is not the right tool

Spotting waste is only a starting point. Naming a waste does not remove it; that takes a method such as PDCA.

Some activity that adds no value is still required, such as legal checks. Reduce it where you can, but do not remove it.

The 7 wastes

Taiichi Ohno described seven wastes (muda) at Toyota: transport, inventory, motion, waiting, overproduction, over-processing and defects. Each uses time or resources without adding value the customer would pay for.

Later writers added an eighth waste, unused talent or skills: not using people's knowledge and ideas. That gives the 8 wastes most lean training uses today.

TIMWOODS

TIMWOODS is one memory aid for the 8 wastes: Transport, Inventory, Motion, Waiting, Overproduction, Over-processing, Defects and Skills.

DOWNTIME

DOWNTIME is another memory aid for the same list: Defects, Overproduction, Waiting, Non-utilized talent, Transportation, Inventory, Motion and Extra-processing. Teams pick whichever is easier to remember; the wastes are the same.

Seven wastes and the eighth

Taiichi Ohno described seven wastes: overproduction, waiting, conveyance, processing, inventory, motion and correction.

Many lean practitioners add an eighth, unused talent. Jeffrey Liker's The Toyota Way discusses it as unused employee creativity.

Muda, mura and muri
TermMeaningExample
MudaWaste: activity that adds no valueParts waiting between steps
MuraUnevenness in the flow of workOrders bunched at month end
MuriOverburden of people or equipmentA machine run beyond its rated speed

FAQ

The 8 Wastes of Lean: common questions

Are the 8 wastes a lean tool?
The 8 wastes are a lean concept rather than a single tool. They give teams a shared language for spotting waste before applying tools like value stream mapping or 5S.
What are the 8 wastes of lean?
Defects, overproduction, waiting, non-utilized talent, transportation, inventory, motion and extra processing. Together they spell DOWNTIME.
Which waste is the worst?
Taiichi Ohno singled out overproduction, because it creates other wastes like inventory, transport and hidden defects.
What are the 7 wastes of lean?
Transport, inventory, motion, waiting, overproduction, over-processing and defects.
What does TIMWOODS stand for?
Transport, Inventory, Motion, Waiting, Overproduction, Over-processing, Defects and Skills.
What does DOWNTIME stand for?
Defects, Overproduction, Waiting, Non-utilized talent, Transportation, Inventory, Motion and Extra-processing.
What is the difference between muda, mura and muri?
Muda is waste, mura is unevenness and muri is overburden. Uneven work and overburden often create the waste.
What is the difference between the 7 and 8 wastes?
The original seven come from Taiichi Ohno. The eighth, unused talent, was added later by lean practitioners.