How to measure OEE: start tracking without a big IT project

How to measure OEE with a paper tracking sheet before buying software: what to record, how to calculate it and when OEE tracking is worth automating.

September 21, 2026 · 2 min read · OEE Software

By the lean-stack editorial team

To measure OEE, record planned time, downtime, total count and good count for one machine on every shift.

Overall equipment effectiveness multiplies availability, performance and quality into one number. The number matters less than the losses behind it.

You can start measuring OEE this week with a sheet of paper. This guide explains the formula, what to record and when software starts to help.

How to calculate OEE

Availability is run time divided by planned production time. Performance is ideal cycle time times total count, divided by run time. Quality is good count divided by total count.

OEE is the three multiplied together. The OEE calculator does the math and walks through an example step by step.

The six major losses

OEE is usually analyzed through six major losses: failures, adjustments, minor stoppages, reduced speed, scrap and rework. Seiichi Nakajima described them in his work on TPM.

Each factor of OEE holds two of the losses. Knowing which loss is largest tells you which lean tool to use next.

Start with one constraint

Measure the bottleneck machine first. It sets the output of the whole line, so gains elsewhere may not raise output.

An OEE tracking sheet on paper

Put a sheet at the machine with one row per hour. Operators record the planned output, the actual output, stops longer than a few minutes and a reason code for each.

Keep the reason codes short and agreed with the team, such as no material, changeover, breakdown and quality check. Review the sheet at the daily huddle.

Make losses visible

Show the loss Pareto at the shift huddle, so the team can act on it. Andon signals help the team react while the loss is happening, not the next day.

Setup losses point to SMED. Breakdowns and minor stops point to TPM.

When to automate OEE tracking

Manual sheets catch long stops well but miss minor stops and slow running. Move to OEE software when those losses matter, or when you track more than a few machines.

The lean manufacturing guide shows how OEE fits with the other shop-floor tools.

Frequently asked questions

How is OEE calculated?
OEE is availability multiplied by performance multiplied by quality. The OEE calculator works it out from run time, output and good parts.
What are the six big losses in OEE?
They are breakdowns, setups and adjustments, minor stops, reduced speed, start-up rejects and production rejects. Each one lowers availability, performance or quality.
Do you need software to start measuring OEE?
No. A paper sheet at one constraint machine is enough to start. Automate once the team uses the numbers daily and manual recording becomes the bottleneck.
Which machine should you measure first?
Start with the constraint, the machine that limits the output of the whole line. Gains there raise output for the whole process.

Choosing OEE Software?

Read the buying guide: what to look for, mistakes to avoid and questions to ask vendors.

Open the guide

For vendors

Built a lean tool?

Submit it for review. Every tool is checked against our listing criteria and researched from public sources. Approved tools join their category in the next published batch.